The Trans-Tokyo Bay Highway Crossing, completed in 1997, is 11 km in total length and is a combined tunnel and multiple bridge route that includes a ten-span continuous steel box-girder bridge with a total length of 1,630 m. The two longest spans of this bridge measure 240 m, and the highway consists of four lanes with an overall width of 22.9 m. In this bridge, significant vibration due to vortex shedding was observed under prevailing winds almost transverse to the bridge axis. This vortex-induced first-mode vibration peaked at a wind velocity around 16-17 m/s, with a maximum amplitude exceeding 50 cm. This paper describes the vortex-induced vibration that occurred in these particular spans, together with the extensive number of wind tunnel tests that were conducted before and after the bridge construction. It is shown that the results from the field and from the wind tunnel tests are fairly consistent regarding the amplitudes and wind speed range of the vortex-induced vibration in the first vertical vibrational mode of the bridge. The TMDs developed specifically to control first and second vertical flexural modes of this bridge and aerodynamic vibration controls employed for higher modes are also explained.
机译:1997年竣工的跨东京湾公路交叉口全长11公里,是一条隧道和多桥组合路线,包括一座全长1,630米的十跨连续钢箱梁桥。这座桥最长的两座跨度为240米,高速公路由四条车道组成,总宽度为22.9米。在这座桥中,在几乎横向于桥轴线的盛行风下,观察到由于涡流脱落而产生的显着振动。这种涡旋引起的第一模振动在风速约为16-17 m/s时达到峰值,最大振幅超过50 cm。本文描述了在这些特定跨度中发生的涡流引起的振动,以及在桥梁施工前后进行的大量风洞测试。结果表明,在桥梁第一垂直振动模式下,涡流引起的振动的振幅和风速范围与现场和风洞试验的结果相当一致。还解释了专门为控制该桥的第一和第二垂直弯曲模式而开发的TMD,以及用于更高模式的空气动力学振动控制。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号