首页> 外文期刊>Indian Railways >MoSR Inspects Mumbai-Ahmedabad High Speed Rail Corridor Construction Activity Between Surat Vapi
【24h】

MoSR Inspects Mumbai-Ahmedabad High Speed Rail Corridor Construction Activity Between Surat Vapi

机译:MoSR Inspects Mumbai-Ahmedabad High Speed Rail Corridor Construction Activity Between Surat Vapi

获取原文
获取原文并翻译 | 示例
           

摘要

Smt. Darshana Jardosh, Minister of State for Railways and Textiles on 17th February, 2022 inspected the work of Mumbai - Ahmedabad High Speed Rail at project site between Surat and Vapi. The Minister started the visit with Casting yard at Ch. 243 in village Padgah, District Navsari for inspection for preparatory works of casting of girder planned for castings including casting of Pile cap at Ch. 242 P42 P23. Next stop was Casting yard at Ch. 238 (village Nasilpore, Dist Navsari) where she witnessed display of heavy equipment like straddle carrier of capacity 1100 T and bridge gantries. Another casting yards visited by her were Casting yards at Ch. 232 (village Kachchol, Dist Navsari) witnessing casting of full span girder, operation of ready-made steel plant (RMS) Plant, automatic cutting of steel and Ring/ stirrup making plant and inspection of viaduct piers from Ch. 197 to 195 in village Pathri District Valsad. At the end, the Minister also visited the Daman Ganga river site where Foundation of river bridge is taking place.

著录项

  • 来源
    《Indian Railways》 |2022年第12期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号