首页> 外文期刊>Sadhana: Academy Proceedings in Engineering Science >Solving grid scheduling problem using an amalgam of swarm and traditional approach
【24h】

Solving grid scheduling problem using an amalgam of swarm and traditional approach

机译:Solving grid scheduling problem using an amalgam of swarm and traditional approach

获取原文
获取原文并翻译 | 示例
           

摘要

Traditional algorithms have been used in determining solutions for the grid scheduling problem. However, it has been witnessed in the recent times that the increased complexity and size of the job have been a reason for the degradation in algorithm's performance. This led to the emergence of a new class of heuristic algorithms that gives optimal or near-optimal solutions to optimization problems. The proposed algorithm solves multi-objective grid scheduling problem and performs further optimization. The proposed swarm-based algorithm is a threshold-constrained Ant Colony Optimization using Shortest Job First (SJF) in initialization step. The characteristics of proposed algorithm are as follows. It minimizes the job completion (execution) time and enhances resource utilization. It supports load balancing and scalability. The performance test of algorithms is carried out using a real-time dataset, which can set benchmark results for future research. Simulation results reveal that the proposed swarm algorithm obtains promising results over other algorithms taken for comparison.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号