...
首页> 外文期刊>Energy Argus petroleum coke >AM’s Fos steelworks to shut indefinitely in 6-8 weeks
【24h】

AM’s Fos steelworks to shut indefinitely in 6-8 weeks

机译:AM’s Fos steelworks to shut indefinitely in 6-8 weeks

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

ArcelorMittal, Europe’s largest steelmaker, says the process to shut down the French steelworks is “well under way”, with the process taking 6-8 weeks in total owing to its complexity. ArcelorMittal was ordered to close the Fos-sur-Mer steelworks temporarily by the Labour Inspectorate, which found that pollution levels at the site represented a danger to the health of employees. It is unclear when, if ever, the site will be reopened.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号