首页> 外文期刊>Journal of civil engineering and management >CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION
【24h】

CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION

机译:中东和北非地区建筑业沟通不畅的原因和影响

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The construction industry in the Middle East and North Africa (MENA) faces many challenges throughout the project's lifecycle; on top of these challenges is poor communication which occasionally results in project failure or at least time and cost overruns. A range of steps and methods must be taken to minimize the causes and effects of poor communication to enhance communication. The main aim of the study is to exploring poor communication in MENA construction industry and defining the causes and effects of poor communication from the perspective of consultants, clients, and contractors in small and medium enterprises in a developed region like MENA. Construction professionals from different project parties were asked to complete a questionnaire listing 32 causes and 21 effects of poor communication identified from the literature. The model was validated by Structural Equation Modelling SEM in terms of convergent and discriminant validities. The results revealed, that out of 54 cause and effect factors of poor communication, only 18 factors were retained. These causes and effects were ranked using the relative importance index RII. Results showed that all causes and effects are highly important, with RII above 0.6. The most important causes of poor communication are lack of communication procedure and training, followed by lack of adequate representation for project stakeholders. However, the least important cause of poor communication is a lack of understanding among the construction parties. Conversely, the most acute effects of poor communication are misinterpretation, followed by conflict among construction parties. However, the least important effect of poor communication is a late response to the disaster. Results and recommendations derived from this study represent the vital need of the MENA construction industry to focus on enhancing the current status of communication. The commitment of all project stakeholders to the drawn recommendations regarding the causes of poor communication will undoubtedly limit or reduce the effects of poor communication. Construction firms looking to improve their performance may benefit from the developed model.
机译:中东和北非 (MENA) 的建筑业在整个项目生命周期中面临许多挑战;除了这些挑战之外,沟通不畅偶尔会导致项目失败,或者至少会导致时间和成本超支。必须采取一系列步骤和方法,以尽量减少沟通不畅的原因和影响,以加强沟通。该研究的主要目的是探索中东和北非地区建筑业的沟通不畅,并从中东和北非等发达地区的中小企业的顾问、客户和承包商的角度确定沟通不畅的原因和影响。来自不同项目方的建筑专业人员被要求完成一份问卷调查,列出从文献中确定的沟通不畅的 32 个原因和 21 个影响。通过结构方程建模扫描电镜(Structural Equation Modelling SEM)验证了该模型的收敛效度和判别效度。结果显示,在沟通不畅的54个因果因素中,只有18个因素被保留。这些原因和影响使用相对重要性指数RII进行排名。结果表明,所有因果关系都非常重要,RII高于0.6。沟通不畅的最重要原因是缺乏沟通程序和培训,其次是缺乏对项目利益相关者的充分代表。然而,沟通不畅的最不重要的原因是施工方之间缺乏理解。相反,沟通不畅最严重的影响是误解,其次是施工方之间的冲突。然而,沟通不畅最不重要的影响是对灾难的延迟反应。这项研究得出的结果和建议代表了中东和北非地区建筑业的迫切需要,即专注于提高当前的沟通状况。所有项目利益攸关方对关于沟通不畅原因的建议的承诺无疑将限制或减少沟通不畅的影响。希望提高绩效的建筑公司可能会从开发的模型中受益。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号