首页> 外文期刊>Geotechnical and geological engineering >Research on the Failure Mechanism and Control Technology of a Near-Fault Roadway Floor
【24h】

Research on the Failure Mechanism and Control Technology of a Near-Fault Roadway Floor

机译:Research on the Failure Mechanism and Control Technology of a Near-Fault Roadway Floor

获取原文
获取原文并翻译 | 示例
           

摘要

Aiming at addressing the serious problem of floor heave near the fault roadway, this paper conducts an on-site investigati on of the pump room in a mining area and analyzes the influencing factors of the floor heave near the fault roadway. On this basis, the disturbance mechanism of the fault on the roadway stability was studied through theoretical analysis. The numerical model of the near-fault roadway was established by finite difference software (FLAC3D) and the orthogonal test scheme was designed to explore the influence of the three factors of roadway-fault distance, fault dip angle and fault friction coefficient on the floor heave. Based on the theory of "two points and three zones," the sensitivity of the zero-displacement marking-depth change under different support schemes was systematically studied. The principle of floor treatment and the combined support technology of floor grouting anchor cable and T-shaped steel belt were proposed in a governance plan. The engineering results show that with the adoption of the new support scheme, the deformation of floor was reduced from 1106 to 134 mm, which verifies that the treatment of the floor heave was highly effective.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号