...
首页> 外文期刊>Valve World >Groundbreaking ceremony for the expansion and modernisation of the GF location in Seewis
【24h】

Groundbreaking ceremony for the expansion and modernisation of the GF location in Seewis

机译:Groundbreaking ceremony for the expansion and modernisation of the GF location in Seewis

获取原文
获取原文并翻译 | 示例
           

摘要

The future of GF's facility in Seewis (Switzerland/Canton Grisons) was ushered in with a ceremonial groundbreaking today. The comprehensive modernisation plan includes the construction of a new high-bay warehouse. The ceremony featured the first step in the demolition of the old warehouse; a state-of-the-art high-bay warehouse designed in line with the latest ecological criteria will be built instead. This first phase will take around 20 months.

著录项

  • 来源
    《Valve World》 |2023年第5期|共1页
  • 作者

    Joanne Mcintyre;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 TH134.1;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号