Risk Management in Oil and Gas(EPC) Industry

机译:Risk Management in Oil and Gas(EPC) Industry

获取原文
获取原文并翻译 | 示例
           

摘要

The five most important risk factors identified in the design phase are 1 scope uncertainty, 2 failed management and planning, 3 changes in errors and omissions, 4 inadequate projects team structure, 5 inadequate quality requirements. The top five risk factors determined by the procurement category are 1 Inadequate online resources and equipment, 2 Distribution of suppliers, 3 Uncertainty in design and style, codes, requirements and standards, 4 Defective items, and 5 Compromise. The 5 most important risk factors identified in the construction phase are 1 weak project capability, 2 excessive construction costs, 3 major construction delays, 4 strong project plan, and 5 poor safety management. This was initiated by the link between risk factors and the effects on price, quality and timing, as well as the potential for expensive, common, and high-quality outcomes.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号