首页> 外文期刊>Engine professional >TB 2897 (continued)
【24h】

TB 2897 (continued)

机译:TB 2897 (continued)

获取原文
获取原文并翻译 | 示例
       

摘要

Stage 4: Tighten to 115 INB/LBS (13 Nm). Stage 5: Tighten a second time to 115 INB/LBS (13 Nm). Repeat Stage 5, if any fastener moves more than 5 degrees in Stage 5. NOTICE: Failure to install the oil spray bar in steps may result in damage to the oil spray bar. Install the right-hand oil spray bar, turn the nuts 2 revolutions at a time in the sequence shown in Figure 1 until the oil spray bar nuts can be tightened. Tighten the nuts in sequence to 89 IN/LBS (11 Nm).

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号