Improvements in deviation settlement mechanism of Indian electricity grid system through demand response management

机译:基于需求响应管理的印度电网系统偏差结算机制的改进

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

settlement mechanism of Indian electricity grid system through demand response management (DRM) with the objective to minimize real-time under-injection/ over-drawl or maximize real-time over-injection/underdrawl with respect to scheduled injection/drawl such that the deviation settlement charge (DSC) is minimum, subject to the network power flow equations, transmission line capability constraints, DRM constraints and bounds on variables. The mechanism to settle the unscheduled transactions, commonly named as deviation settlement mechanism (DSM), has been implemented to achieve grid frequency stability by imposing penalties and paying incentives, also known as DSC, for over- and under-drawls from the scheduled transactions. In this paper, the improvements in DSM have been solved as an optimization problem to minimize the DSC for a time period of 96 time-blocks (each of 15 min duration). The proposed improvement in DSM has been tested on modified IEEE 9-Bus system. It has been assumed that the generators installed at bus numbers 1, 2 and 3 are the central generating stations, which are monitored and controlled by the regional load dispatch center (RLDC). The simulation results are obtained (with varying percentages of shifting and different participating patterns of prosumers) for which the remarkable benefits of the proposed improvement in DSM (in terms of DSC minimization and improvement in the voltage profile and power flow) have been presented.
机译:印度电网系统通过需求响应管理(DRM)的结算机制,其目的是在计划注入/抽出方面最小化实时注进/过抽引或最大化实时过注/抽吸,使偏差沉降费用(DSC)最小,但受网络潮流方程、输电线路能力约束、DRM约束和变量限制。计划外交易的结算机制,通常称为偏差结算机制(DSM),通过对预定交易的超额和不足提款施加处罚和支付奖励(也称为DSC),以实现电网频率稳定。在本文中,DSM 的改进已作为优化问题求解,以在 96 个时间块(每个时间段的持续时间为 15 分钟)内最小化 DSC。DSM的改进已经在修改后的IEEE 9总线系统上进行了测试。假设安装在 1、2 和 3 号公交车上的发电机是中央发电站,由区域负荷调度中心 (RLDC) 监控和控制。仿真结果(具有不同的移位百分比和产消者的参与模式不同),并展示了所提出的DSM改进(在DSC最小化以及电压曲线和功率流的改善方面)的显着优势。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号