NEW NMHC CONSTRUCTION SURVEY FINDS RECORD IMPACT ON AVAILABILITY OF CONSTRUCTION LABOR

机译:NEW NMHC CONSTRUCTION SURVEY FINDS RECORD IMPACT ON AVAILABILITY OF CONSTRUCTION LABOR

获取原文
获取原文并翻译 | 示例
           

摘要

A record 93 of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the eighth edition of the National Multifamily Housing Council (NMHC) Construction Survey.Of this group, 83 reported experiencing delays in both starts and permitting, up slightly from the 80 in round seven and comparable to the results seen in the earlier rounds. The main reason cited for delays in starts was permitting, entitlement, and professional services (91). Economic uncertainty and projects being economically unfeasible have both become less of a concern, decreasing 13 and 27 percentage points, respectively, since Round 7."While the overall outlook for the industry is clearly positive, these short and mid-term risks pose significant threats to housing affordability and the nation's economic recovery," said NMHC President Doug Bibby. "Steps must be taken to increase the supply of labor across the country and bring material costs back to reasonable levels."

著录项

  • 来源
    《Housing and development reporter》 |2021年第21期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号