首页> 外文期刊>Facilities >An analytic network process model for hospital facilities management performance evaluation
【24h】

An analytic network process model for hospital facilities management performance evaluation

机译:一种用于医院设施管理绩效评估的分析网络过程模型

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Purpose This study aims to establish a rigorous model that can pragmatically evaluate the facilities management (FM) performance of hospitals.Design/methodology/approach Among the applicable performance indicators that were identified from extant literature, a focus group study shortlisted ten key performance indicators (KPIs) in four categories (safety, physical, financial and environmental) and verified their practicality. Using the analytic network process (ANP) method to process the focus group’s responses yielded importance weightings for the KPIs and developed the intended evaluation model. This model was then validated by a case study.Findings From the empirical data collected, two types of FM performance data and two scenarios of KPI scores were identified. To process these data and scores, a robust calculation method was devised and then proved useful in obtaining an overall score for holistic hospital FM performance. The case study confirmed the appropriateness and validity of the model developed.Research limitations/implications Through illustrating how the ANP method could be applied to develop an FM performance evaluation model, the study contributes knowledge to the multi-criteria decision-making domain. Despite the geographical limitation of the model established (i.e. centered around a group of hospitals investigated in Hong Kong), the study can serve as a reference for developing performance evaluation models for other buildings or infrastructures globally.Practical implications The model constitutes a practical tool for evaluating the FM performance of hospitals. Using this model on a regular basis will enable performance benchmarking and hence, continuous improvement of FM services.Originality/value The ANP model established is the first of its kind tailored for evaluation of hospital FM performance.
机译:目的 本研究旨在建立一个严谨的模型,以务实地评估 hospitals.Design/methodology/approach 的设施管理(FM)绩效 在从现有文献中确定的适用绩效指标中,焦点小组研究列出了四个类别(安全、物理、财务和环境)的十个关键绩效指标 (KPI),并验证了其实用性。使用分析网络过程 (ANP) 方法处理焦点小组的回答,为 KPI 生成重要性权重,并开发预期的评估模型。然后通过案例研究验证了该模型。结果 从收集到的经验数据中,确定了两种类型的 FM 性能数据和两种 KPI 分数方案。为了处理这些数据和分数,设计了一种稳健的计算方法,然后证明可用于获得整体医院 FM 绩效的总体分数。案例研究证实了所开发模型的适当性和有效性。研究的局限性/影响 通过说明如何应用 ANP 方法开发 FM 性能评估模型,该研究为多标准决策领域提供了知识。尽管所建立的模型存在地域限制(即以在香港调查的一组医院为中心),但该研究可作为为全球其他建筑物或基础设施开发性能评估模型的参考。实际意义 该模型是评估医院FM绩效的实用工具。定期使用此模型将实现性能基准测试,从而持续改进 FM 服务。原创性/价值 建立的 ANP 模型是第一个为评估医院 FM 性能量身定制的模型。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号