...
首页> 外文期刊>Highways >Work begins on £650k bridge maintenance
【24h】

Work begins on £650k bridge maintenance

机译:Work begins on £650k bridge maintenance

获取原文
获取原文并翻译 | 示例

摘要

Otdham-based contractor Coating Services has started work on a £650,000 programme of maintenance to the eighteenth century Harrington Bridge (pictured) at Sawley in Matlock for Derbyshire County Council. Cabinet member for highways assets and transport, Cllr Kewal Singh Athwal, said: 'Following detailed surveys, we identified the need to give Harrington Bridge a major overhaul and refurbishment to make it fit for many years of use.' Work to the 60 metre-long twin span bridge that carries the B6540 over the River Trent includes carriageway resurfacing, replacement of expansion joints and installing a reinforced concrete leaf at the central pier, and must be complete by mid-October.

著录项

  • 来源
    《Highways 》 |2023年第5期| 9-9| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号