...
首页> 外文期刊>Climate and Energy >New Electric Transmission and Permitting Reform: Can't Have One without the Other
【24h】

New Electric Transmission and Permitting Reform: Can't Have One without the Other

机译:New Electric Transmission and Permitting Reform: Can't Have One without the Other

获取原文
获取原文并翻译 | 示例
           

摘要

A May 4, 2023 Editorial in the New York Times conveyed very well a strong message that industry leaders have been talking about and stressing for years. “The United States needs to dramatically expand the electric grid between places with abundant wind and sunshine and places where people live and work. And it needs to happen fast.” While many mainstream news publications have shared this same view, and industry trade publications have talked about this need for decades, only now have federal and state policymakers found a path forward to take new transmission project siting and permitting reform. Retail energy providers, electric distribution utilities and their unregulated subsidiaries, and renewable energy developers have done all they could to highlight the need and costs to consumers of a congested electric grid that cannot easily move power among and between electricity markets and states, or from remote renewable generation sources to load centers.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号