首页> 外文期刊>Marine Georesources & Geotechnology >Improved calculation method for consolidation of dredger fill treatment using prefabricated vertical-horizontal drains
【24h】

Improved calculation method for consolidation of dredger fill treatment using prefabricated vertical-horizontal drains

机译:改进的预制竖卧排水管挖泥船填埋处理固结计算方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Prefabricated vertical-horizontal drains (PVHDs) with high efficiency have been applied to accelerate the consolidation of dredger fill foundations. Considering the nonlinear characteristics of soil, the horizontal and vertical drainage paths and the penetration degree of horizontal drainage pipes, an improved consolidation calculation method for dredger fill foundations treated by PVHDs was developed. Sensitivity analysis was carried out on the parameters of the PVHDs system, and the effectiveness of the proposed method was verified by field tests. It is found that the parameters C-c/C-k, loading ratio (Delta p/sigma'), and penetration degree (rho) jointly control the rate of the consolidation process. The average settlement consolidation degree (U-s) calculated by the proposed method agrees well with the field test values. By increasing rho from 0.2 to 1.0, the consolidation time can be reduced by half when U-s reaches 90.
机译:高效预制竖卧排水管(PVHD)已应用于加速挖泥船填土基础的加固。综合考虑土体非线性特性、水平、垂直排水路径及水平排水管的贯通度,提出了一种改进的PVHD处理挖泥船填筑地基固结计算方法。对PVHDs系统的参数进行了敏感性分析,并通过现场试验验证了所提方法的有效性。结果表明,C-c/C-k参数、加载比(Delta p/sigma')和渗透度(rho)共同控制固结过程的速率。所提方法计算得到的平均沉降固结度(U-s)与现场试验值吻合较好。通过将rho从0.2增加到1.0,当U-s达到90%时,固结时间可以减少一半。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号