首页> 外文期刊>Indian Railways >Indian Railways Achieved a Significant Milestone with Electrification of Entire BG Network in Uttar Pradesh
【24h】

Indian Railways Achieved a Significant Milestone with Electrification of Entire BG Network in Uttar Pradesh

机译:Indian Railways Achieved a Significant Milestone with Electrification of Entire BG Network in Uttar Pradesh

获取原文
获取原文并翻译 | 示例
           

摘要

With the completion of electrification of Subhagpur-Pachperwa Broad Gauge (BG) route in North Eastern Railway, Indian Railways has completed the electrification of all BG routes in Uttar Pradesh. Hon'ble Prime Minister Shri Narendra Modi has appreciated Indian Railways for accomplishing this remarkable feat. With this achievement, Indian Railways has completed electrification of BG routes in six zonal railways namely, East Coast Railway, North Central Railway, North Eastern Railway, Eastern Railway, South Eastern Railway, West Central Railway. Also, Highly Utilized Network (HUN-5), Jhansi-Muzzaffarpur-Katni is fully electrified now. This will improve connectivity between Jhansi-Lucknow-Barabanki-Burhwal, Gonda- Anandnagar- Gorakhpur- Valmikinagar- Sugauli, Muzzaffarpur- Bachwara and Narkatiyaganj - Raxual- Sitamarhi- Darbhanga- Samastipur, Sitamarhi- Muzzaffarpur- Hazipur including Bhatni- Varanas-Naini (Allahabad)- Manikpur- Satna-Katni and Chhapra- Varanasi.With 85% of RKM electrified, Indian Railways is rapidly progressing to accomplish Mission 100 Percent Electrification and become the largest green railway network in the world.

著录项

  • 来源
    《Indian Railways》 |2023年第12期|31-31|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号