As of 3 June 2022, pipeline companies completed two crude oil pipeline projects in the US, according to the ElA's recently updated Liquids Pipeline Projects Database. No new hydrocarbon gas liquids or petroleum product pipeline projects were completed in the first five months of 2022. The completed crude oil pipeline projects are: Energy Transfer Ted Collins Pipeline, a 275 000 bpd pipeline that transports crude oil along the Gulf Coast from the Nederland terminal to the Houston Ship Channel, which are both in Texas. Energy Transfer Cushing South Phase II, a 55 000 bpd expansion of the Cushing South project. The Cushing South project includes three existing Energy Transfer pipelines, and a reversal and interconnection with the Centurion pipeline that transports crude oil from terminals in Platteville, Colorado, and Cushing, Oklahoma, to Energy Transfer's terminal in Nederland, Texas. Phase I was completed in 2Q21.
展开▼