Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application

机译:Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study investigates a project scheduling problem of prefabricated building (PB) construction in an uncertain environment. Different from the traditional scheduling models in PB construction, we consider a complex multi-stage cooperation system including the production, transportation and assembly (PTA) phases. In this system, both activity durations and resource amounts are stochastic variables. By applying the reliability theory to the stochastic scheduling model innovatively, we formulate a duration reliability model to maximize the probability of non-delayed project completion, within the resource constraints. As the proposed model is a non-deterministic polynomial hard (NP-hard) problem, a hybrid meta-heuristic differential evolution particle swarm optimization (DEPSO) algorithm is developed, which is utilized the mutation factor of the differential evolution (DE) algorithm in the framework of the particle swarm optimization (PSO). Finally, a real-life example of a PB construction project is used to explore the performance of the proposed DEPSO algorithm. The result shows that the hybrid algorithm DEPSO can better find the global optimal solution in the multi-dimensional optimization problem.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号