首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Duo buck trend with greenfield projects
【24h】

Duo buck trend with greenfield projects

机译:Duo buck trend with greenfield projects

获取原文
获取原文并翻译 | 示例
       

摘要

MOST of Australia's major offshore operators are focused on the safe and stable production of their existing fields with very little new greenfield investment planned in the near term. Woodside and Santos are the exceptions. Santos this year sanctioned the US$3.6 billion Barossa gas project, and Woodside hopes to follow suit later this year with the Scarborough and Pluto Train 2 investments. Santos is also committed to a final investment decision in the first half next year on the US$2 billion Dorado oil project. Woodside is wrapping up some smaller subsea projects - Greater Western Flank Ⅲ, Pyxis Hub and Julimar-Brunello phase two -after which it needs to fill the gap with Scarborough and Pluto Train 2. Woodside will be in a serious spot of bother if Scarborough and Pluto Train 2 do not proceed, as it has no back-up projects apart from Sangomar, in Senegal, and the challenged Browse and Myanmar A-6 projects.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号