首页> 外文期刊>District energy >At Microsoft headquarters in Redmond, a model solution to electrification
【24h】

At Microsoft headquarters in Redmond, a model solution to electrification

机译:At Microsoft headquarters in Redmond, a model solution to electrification

获取原文
获取原文并翻译 | 示例
           

摘要

In 2018, Microsoft began work on a forward-looking district energy system for a 3 million square foot modernization project on its Redmond, Wash., campus, which would replace 12 older buildings with 17 new ones. Just four years later - in 2022 - the new Thermal Energy Center was commissioned, running on 100% carbon-free electricity with an operating efficiency that exceeds code requirements by threefold. Affiliated Engineers Inc. (AEI) -serving as executive engineer for design and as engineer of record - designed the center and its supporting thermal and electric distribution systems to meet heating and cooling demands. The all-electric plant utilizes low-temperature hot water distribution, heat recovery chillers, closed-loop geothermal and thermal energy storage.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号