首页> 外文期刊>OR Spectrum: quantitative approaches in management >A GRASP heuristic for slab scheduling at continuous casters
【24h】

A GRASP heuristic for slab scheduling at continuous casters

机译:A GRASP heuristic for slab scheduling at continuous casters

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we develop an approach for scheduling slabs at continuous casters in the steel industry. The scheduling approach incorporates specific constraints such as flexible production orders, material supply in batches and different setup types. We further introduce a continually adjustable casting width, which corresponds to a technological control parameter. We present a new MILP model formulation, which integrates slab design and scheduling. Solutions for the model are obtained by a greedy randomized adaptive search procedure. We analyze the applicability and performance of the approach in a numerical case study which is based on real world data. High-valued feasible production plans can be obtained in reasonable computing time. The approach is able to solve industry size problem instances in reasonable time. As compared to the status-quo, on average savings in the number of charges of 10.6 % are obtained.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号