首页> 外文期刊>Building Engineer >CROSS UK Report 1029
【24h】

CROSS UK Report 1029

机译:CROSS UK Report 1029

获取原文
获取原文并翻译 | 示例
       

摘要

A building control officer is disquieted by the quality of a design submission and the approach of a fire engineer in assessing structural fire matters. The reporter is a building control officer and they review fire safety designs. This report is about a submission for a project in which an existing building is being incorporated into a large new building. The reporter was alarmed because the expected structural fire performance of the existing structure, or any fire resistance rating, was unknown, and yet this issue was left unaddressed by the designer. In contrast, the requirement in technical guidance for the new development was a fire-resistance rating of 120 minutes, in terms of resistance (R), integrity (E) and insulation (I).

著录项

  • 来源
    《Building Engineer》 |2023年第2期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 建筑科学;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号