Canadian pipeline operator TC Energy has begun evaluating plans for a hydrogen production hub on 140 acres in Crossfield, Alberta. The proposed site would accompany its existing natural gas storage facility in Crossfield that holds 68 Bcf of natural gas. The pipeline company will work with U.S. electric vehicle startup Nikola Corp. on feasibility for the project, which could eventually see the construction and operation of a large-scale hydrogen production facility to distribute fuel for long-haul electric trucks, as well as energy for residential and commercial heating and power generation.
展开▼