首页> 外文期刊>Inside FERC >SPP floats new resilience benefit metric for grid projects near seam with MISO
【24h】

SPP floats new resilience benefit metric for grid projects near seam with MISO

机译:SPP floats new resilience benefit metric for grid projects near seam with MISO

获取原文
获取原文并翻译 | 示例
           

摘要

Southwest Power Pool is for the first time floating a metric tomeasure the resilience benefit of grid projects that could boostinterregional transfer capability, a conversation that could haverelevance for the broader national debate about the importanceof interregional projects.Recent weather events have highlighted the role thatinterregional transfers have in keeping the lights on. During the2021 winter weather event, Midcontinent Independent SystemOperator and SPP were able to transfer nearly 13,000 MW thoughtheir ties to alleviate generation shortfalls.

著录项

  • 来源
    《Inside FERC》 |2023年第6期|6-7|共2页
  • 作者

    Kate Winston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号