首页> 外文期刊>Environmental modeling & assessment >Assessing a Transition to 100 Renewable Power Generation in a Non-interconnected Area: A Case Study for La Reunion Island
【24h】

Assessing a Transition to 100 Renewable Power Generation in a Non-interconnected Area: A Case Study for La Reunion Island

机译:Assessing a Transition to 100 Renewable Power Generation in a Non-interconnected Area: A Case Study for La Reunion Island

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, we present a comprehensive, multi-timescale approach to evaluate energy transition policies aiming at fully renewable generation in power systems of non-interconnected areas, typically islands or remote regions. The approach links three dynamic models: (i) a capacity expansion model, ETEM-SG, proposes an investment and generation plan for typical days, up to 2030; (ii) a simplified dispatch model is used to validate the generation plan for a full year of weather data and demand variations; and (iii) a static and dynamic analysis of the power system is used to assess the stability of the new power system for rapid events such as a sudden reduction of renewable generation. The proposed three-step approach generates a cost-effective long-term investment planning that ensures the balance between supply and demand at an hourly time step and the stability of the power system at a timescale of milliseconds. The presentation is based on a case study fully described in a report [1] made with ADEME, the French Agency for Ecological Transition, for the French island of La Reunion. It shows how a reliable 100% renewable power supply is achievable by 2030, in this area.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号