...
首页> 外文期刊>Environmental Progress >Full‐scale remediation of a grey iron foundry waste surface impoundment
【24h】

Full‐scale remediation of a grey iron foundry waste surface impoundment

机译:Full‐scale remediation of a grey iron foundry waste surface impoundment

获取原文
           

摘要

AbstractA large grey iron foundry was facing remediation of a surface impoundment containing approximately 300,000 cubic yards of EP‐Toxic sludge. The sludge was generated by the settling of wastewater solids from air emission control systems connected with cupola melting operations. Bench‐scale treatability testing was used to evaluate various chemical treatment possibilities for rendering the sludge non‐EP‐Toxic. Several phosphate sources and different engineering options were evaluated for cost‐effectiveness of full‐scale remediation. The most economical option was to dredge the solids continuously as a slurry (while the impoundment remained in operation) with injection of phosphoric acid into the slurry pipeline. The treatment process was controlled by monitoring residual phosphate in the treated slurry. The remediation process was tested in a month‐long field trial using full‐scale equipment, and was followed by successful remediation during a 6‐month period. A technical overview and performance data on the remediation proc

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号