首页> 外文期刊>quality and reliability engineering international >A comparison of control charts from the viewpoint of change‐point estimation
【24h】

A comparison of control charts from the viewpoint of change‐point estimation

机译:A comparison of control charts from the viewpoint of change‐point estimation

获取原文
       

摘要

AbstractISO/DIS 7870 has presented the cumulative sum chart, the moving average chart, and the exponentially weighted moving average chart as control charts using accumulated data. In this paper, we compare the three control charts in terms of change‐point estimation. We show the probability distribution, the bias and the mean square error of the change‐point estimators using a Markov process and Monte Carlo simulation. These control charts have almost equivalent performances based on average run length considerations when parameters of each control chart are set appropriately. However, from the viewpoint of change‐point estimation we recommend the CUSUM

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号