PacifiCorp's 53 hydroelectric projects are a valued part of the utility's diversified mix of generating facilities. Several of its small projects have water conveyance systems that are nearing or have reached the end of their useful life. PacifiCorp has developed and implemented innovative and cost-effective methods of repairing and replacing aged sections of flow lines at three projects: the 4-MW Bigfork, 6-MW Powerdale, and 3-MW Eastside plants.
展开▼