首页> 外文期刊>Water resources management >Combined Effects of Parallel and Series Detention Basins for Flood Peak Reduction
【24h】

Combined Effects of Parallel and Series Detention Basins for Flood Peak Reduction

机译:平行和串联滞留池减少洪峰的综合效应

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A simple analytical method is proposed that allows a preliminary evaluation of the overall efficiency of a detention basin system for flood risk reduction in a specific target section. Solutions are provided both for parallel and series systems, under some simplifying assumptions concerning the linearity of detention basin, river network and watershed responses. Further, for the series configuration a regressive model is proposed for the computation of the overall efficiency, because of the complexity of analytical solution. A case study is also presented, where the overall efficiency of a system of nine detention basins is computed by means of both the analytical and the regressive model. Results are discussed to assess the different influence of detention basins in parallel or in a series system.
机译:提出了一种简单的分析方法,可以初步评估滞洪池系统在特定目标断面降低洪水风险方面的整体效率。在一些关于滞留盆地、河网和流域响应的线性的简化假设下,为并联和串联系统提供了解决方案。此外,由于解析解的复杂性,对于级数配置,提出了一种回归模型来计算整体效率。还介绍了一个案例研究,其中通过分析模型和回归模型计算了九个滞留盆地系统的整体效率。对结果进行了讨论,以评估并行或串联系统滞留盆地的不同影响。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号