Project Portfolio Selection and Scheduling with Resource Allocation, Synergies, and Project Divisibility

机译:具有资源分配、协同效应和项目可分性的项目组合选择和调度

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A project portfolio can be defined as a set of project proposals that are selected according to one or more criteria by a decision-maker (individual or group). Regularly, the portfolio selection involves different decision problems, among those evaluation, selection, scheduling, and resource allocation. In published scientific literature, these problems have been addressed mainly separately giving as a result suboptimal solutions (portfolios). In addition, elements as partial allocation and project representation through tasks constitute relevant characteristics in practice that remain unaddressed in depth. The proposal of this research is to integrate the project selection and project scheduling, incorporating all relevant elements of both decision problems through the scheduling of tasks allowing to determine when the task will be funded and executed. The main impact of precedence rules at the task level in the portfolio is also studied. In this work, Project Portfolio Selection and Scheduling Problem (PPSS) is studied and solved through a new mixed-integer linear programming (MILP) model. The model incorporates renewable and nonrenewable resource allocation, along with partial and total funding policies, project divisibility, and interdependences. Scheduling is integrated into the model, both at the project level and at the project task level, which allows scheduling in noncontiguous periods. Small instances (up to 64 projects) and medium instances (up to 128 projects) were solved optimally in very short times. The relationship between the quality of near-optimal solutions and the solution computing time by modifying the parameters of the solver employed was researched. No significant change in the solution's quality was perceived, but a significant reduction in solution computing time was achieved. Furthermore, the main effects of precedence rules on solution times and portfolio impact were studied. Results show that even if few precedence rules were introduced, the resource allocation of tasks changed significantly, even though the portfolio impact or the number of projects of the selected portfolios remains the same.
机译:项目组合可以定义为决策者(个人或组)根据一个或多个标准选择的一组项目建议。通常,项目组合选择涉及不同的决策问题,包括评估、选择、调度和资源分配。在已发表的科学文献中,这些问题主要单独解决,因此给出了次优解决方案(组合)。此外,部分分配和通过任务表示项目等要素构成了实践中尚未深入解决的相关特征。本研究的建议是整合项目选择和项目调度,通过任务调度将两个决策问题的所有相关要素结合起来,从而确定任务何时获得资助和执行。还研究了优先级规则在项目组合中任务级别的主要影响。本文通过一种新的混合整数线性规划(MILP)模型研究并求解了项目组合选择和调度问题(PPSS)。该模型包括可再生和不可再生资源分配,以及部分和全部资助政策、项目可分割性和相互依存性。在项目级别和项目任务级别,进度安排都集成到模型中,这允许在不连续的期间进行进度安排。小型实例(最多 64 个项目)和中型实例(最多 128 个项目)在很短的时间内得到了最佳解决。通过修改求解器的参数,研究了近最优解的质量与求解计算时间之间的关系。没有发现解决方案的质量有显著变化,但解决方案计算时间显著缩短。此外,还研究了优先规则对求解时间和组合影响的主要影响。结果表明,即使引入了很少的优先规则,任务的资源分配也发生了显著变化,即使所选项目组合的投资组合影响或项目数量保持不变。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号