...
首页> 外文期刊>Energo: CEE-FSU Power Monitor >88 new photovoltaic power plants get licences in North Macedonia in first two months of 2023
【24h】

88 new photovoltaic power plants get licences in North Macedonia in first two months of 2023

机译:88 new photovoltaic power plants get licences in North Macedonia in first two months of 2023

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

North Macedonia’s Regulatory Commission for Energy and Water Services (RKE) announced that in the first two months of 2023, 88 new photovoltaic power plants with a capacity of 29 MW acquired operating licenses from the commission. The RKE reported a significant increase in interest and investments in renewable energy sources, specifically in photovoltaic power plants, in the country.
机译:北马其顿对能源的管理委员会和水服务(驾驶台)宣布的2023年头两个月,88个新的光伏电厂容量29 MW收购营业执照的佣金。报道在兴趣和显著增加投资于可再生能源,特别是在光伏电站,的国家。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号