...
首页> 外文期刊>Energy in East Europe >company's third hydropower station, and will raise its total installed capacity to 398.5 MW.
【24h】

company's third hydropower station, and will raise its total installed capacity to 398.5 MW.

机译:公司的第三个水电站,并将提高总装机容量为398.5兆瓦。

获取原文
获取原文并翻译 | 示例

摘要

The plant, which features two 35-MW turbines and generators supplied by Alstom Hydro, was part financed through a ?48 million, 12-year loan awarded in August 2010 by Turkiye Is Bankasi. Ayen TAQA eyes Turkish opportunities State-controlled Abu Dhabi National Energy (TAQA) said May 22 that it has formed a joint committee with the Turkish energy ministry to discuss investment opportunities for the oil and gas utility in Turkey. The committee will "discuss the investment opportunities available in the energy sector in Turkey," TAQA said in a statement. The announcement came after a delegation from TAQA, headed by chairman Hamad al-Hurr al-Suwaidi, met with officials from the energy ministry, including the Minister of Energy, Taner Yildiz, TAQA said. Suwaidi, who is also the chairman of Abu Dhabi's Department of Finance, also met with Turkey's Finance Minister Mehmet Simsek, the statement said.
机译:工厂,两个35-MW涡轮机和特性发电机由阿尔斯通水电部分通过资助吗? 4800万年,12年贷款授予2010年8月由Turkiye。收购土耳其担保银行Ayen TAQA眼睛土耳其的机会国有阿布扎比国家能源(TAQA)5月22日表示,该公司已经成立了一个联合委员会与土耳其能源部长讨论石油和天然气的投资机会在土耳其效用。存在的投资机会能源部门在土耳其,”TAQA说声明。为首的代表团TAQA哈马德主席al-Hurr al-Suwaidi,会见的官员能源部,包括部长能源、谭Yildiz, TAQA说。阿布扎比的部门的主席金融,还会见了土耳其的财政部长古板,声明说。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号