首页> 外文期刊>World Steel News >Kumba maintains 2019 production guidance at previous year’s level
【24h】

Kumba maintains 2019 production guidance at previous year’s level

机译:2019,昆巴维护生产指导前一年的水平

获取原文
获取原文并翻译 | 示例
           

摘要

Despite numerous logistic challenges, South Africa’s Kumba Iron Ore (Kumba) managed to meet full-year guidancein 2018. The company planы to maintain 2019 production targets at the same level.Kumba decreased iron ore output by 4% to 43.1 million t year-on-year in 2018 but stayed in line with full-year guidanceat 43?44 million t. The decline was mainly attributed to Sishen mine production slumping by 6% to 29.2 million t, whilethe operating performance of Kolomela mine remained flat at 13.9 million t, according to the official statement. Someoutput reductions were planned for Q4 in order to offset the high stocks accumulated due to Transnet rail constraints,Metal Expert learnt.
机译:尽管许多物流挑战,南部非洲,昆巴的铁矿石(Kumba)设法满足2018年全年guidancein。保持2019在相同的生产目标的水平。4310万吨同比2018年但住在和全年guidanceat 43行吗?下降主要归因于Sishen我的生产下滑6%至2920万吨,虽然这些Kolomela矿的操作性能持平在1390万t,根据官方声明。计划在第四季度为了抵消较高的股票由于铁路公司积累限制,金属专家学习。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号