...
首页> 外文期刊>Applied thermal engineering: Design, processes, equipment, economics >Exergy recovery during LNG regasification: Electric energy production - Part two
【24h】

Exergy recovery during LNG regasification: Electric energy production - Part two

机译:液化天然气再气化过程中的热能回收:电能生产-第二部分

获取原文
获取原文并翻译 | 示例

摘要

In liquefied natural gas (LNG) regasification facilities, for exergy recovery during regasification, an option could be the production of electric energy recovering the energy available as cold. In a previous paper, the authors propose an innovative process which uses a cryogenic stream of LNG during regasification as a cold source in an improved combined heat and power (CHP) plant. Considering the LNG regasification projects in progress all over the World, an appropriate design option could be based on a modular unit having a mean regasification capacity of 2 × 10{sup}9 standard cubic meters/year. This paper deals with the results of feasibility studies, developed by the authors at DREAM in the context of a research program, on ventures based on thermodynamic and economic analysis of improved CHP cycles and related innovative technology which demonstrate the suitability of the proposal.
机译:在液化天然气(LNG)的再气化设施中,为了在再气化过程中进行热能回收,一种选择可以是生产电能,以回收冷能。在以前的论文中,作者提出了一种创新方法,该方法在改进的热电联产(CHP)厂中,在再气化过程中使用低温LNG流作为冷源。考虑到全世界正在进行的液化天然气再气化项目,适当的设计方案可以基于平均气化能力为2×10 {sup} 9标准立方米/年的模块化装置。本文讨论了DREAM作者在一项研究计划的背景下进行的可行性研究的结果,该研究基于对CHP改进循环和相关创新技术的热力学和经济分析得出的风险,证明了该建议的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号