...
首页> 外文期刊>Highways >Repairing Tower Bridge with the world watching
【24h】

Repairing Tower Bridge with the world watching

机译:修复与世界看塔桥

获取原文
获取原文并翻译 | 示例

摘要

Tower Bridge is an instantly recognisable symbol of London, a world famous example of Victorian engineering skill. It is a major tourist attraction but it is also a busy working bridge, crossed by 40,000 people (vehicles, pedestrians and cyclists) and opened for river traffic at least a couple of times every day. So closing this iconic bridge in September 2016 for three months, to allow contractors to replace decking and resurface walkways, made for a very high-profile project. Contractor Infallible Systems, working with IKO PLC, responded to the challenge. And despite some unusual constraints - including the fact that the bridge had to be kept open to pedestrians and river traffic throughout - Tower Bridge re-opened a week ahead of schedule on 23 December.
机译:塔桥是一个象征的形象立刻鲜明起来维多利亚时代的伦敦,一个世界著名的例子工程技能。吸引力也是忙于工作桥,过40000人(车辆、行人和骑自行车的人),打开河流流量每天至少两次。2016年9月三这个标志性的桥梁月,允许承包商更换盖板和重现走道,非常引人注目的项目。系统、处理都PLC的回应挑战。包括桥必须保持这一事实对行人开放和河流流量——塔桥重新提前一个星期12月23日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号