首页> 外文期刊>Highways >40 years of failures
【24h】

40 years of failures

机译:40年的失败

获取原文
获取原文并翻译 | 示例

摘要

Looking back 40 years takes us back to 1977. Back then, motorway and trunk roads were the responsibility of the Road Construction Units. These were a branch of the Department of Transport whose sole purpose was to design, specify and supervise construction of new motorways and trunk roads. With regional offices throughout England and Wales, they were staffed by experienced and expert engineers and supported by a well-funded TRL and the Department's own Engineering Intelligence [Elnt] team. It was the most efficient and effective structure for delivering the new motorway networks that continue to be the backbone of the nation's provision for inter-urban transport. Since the mid 1980s, little new green field construction has taken place. The programme came to a standstill when the aggressive environmental action on new construction sites coincided with a lack of money within Government. This major failure in policy making has led to the inadequate capacity and congestion we are faced with today only temporarily addressed by Smart motorways, and no effective forward plans in place for the significant capacity improvements necessary.
机译:让我们追溯到1977年回顾40年。然后,高速公路和干线公路公路建设单位的责任。这些都是部门的一个分支运输的唯一目的是设计,指定并监督新建设高速公路和干线公路。在英格兰和威尔士,他们组成由经验丰富的工程师和专家和支持资金雄厚的实验室和部门的工程情报(Elnt)团队。最高效和有效的结构提供新的高速公路网络继续成为国家的支柱准备inter-urban运输。1980年代中期,小新绿地建设已经发生。停滞时,积极的环境新建筑工地恰逢一个行动在政府缺钱。在制定政策导致了失败能力不足,我们面临交通拥堵今天只是暂时解决的聪明高速公路,没有有效的推进计划的重要能力改进必要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号