首页> 外文期刊>Highways >Cleveland turns back time on Humber Bridge
【24h】

Cleveland turns back time on Humber Bridge

机译:克利夫兰回头时间在亨伯桥

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Cleveland Bridge has bagged a contract to inspect and refurbish cables on the Humber Bridge, which the Darlington-based steelwork specialist helped build more than four decades ago. The package includes inspecting the eight main 18 metre cable panels on the bridge, which is 2,220 metres long. Cleveland Bridge UK managing director Chris Droogan said: 'As one of the main partners in the construction of the Humber Bridge, I am really pleased that we can again apply our experience and expertise to ensure the extension of the lifespan of this vital and impressive piece of infrastructure.
机译:克利夫兰桥袋装合同检查和翻新电缆在亨伯桥成为辐射达林顿地区《钢专家帮助建立超过四十年前。主要包括检查八18米电缆面板上的桥,长2220米。克利夫兰桥英国董事总经理克里斯Droogan说:“作为一个主要的合作伙伴亨伯桥的建设,我是真的高兴的是,我们可以运用我们的经验和专业知识,确保的延伸寿命这一至关重要的和令人印象深刻的作品基础设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号