首页> 外文期刊>Highways >Contracts round-up
【24h】

Contracts round-up

机译:合同聚集

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

1.Contractors have until 16 April to try to prequalify for a £3.8m scheme to replace Clyde Bridge in Lanark for South Lanarkshire Council. The project comprises a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, plus a stretch of wide carriageway. The proposed approach carriageway will follow a different route and the work will include new approach roads to the North and South to link to the existing C29 Pettinain Road. Five contractors will be shortlisted for the job, which is expected to start in January 2022 and take 18 months to complete. 2. Dyer & Butler has bagged an estimated £8.5m deal for work at the Gablecross roundabout on Stratton Street for Swindon Borough Council. The job is part of a major £72.5m project to improve roads in the east of Swindon before work begins on the New Eastern Villages residential scheme that will see 8,000 houses built to the east of the A419. Atkins is working for the council on the Gablecross scheme and work is expected to commence this summer.
机译:1.预先具有资格为£3.8方案来取代克莱德在拉纳克桥南拉纳克郡委员会。该项目包括一个90米的单跨专有的钢桥来取代现有的钢筋混凝土桥梁结构,再加上一个的宽的车道。车道将遵循一个不同的方法路线和工作将包括新方法公路北部和南部的链接现有的C29 Pettinain道路。将入围工作,是吗预计2022年1月开始,花18个月才能完成。估计£8.5收购工作Gablecross迂回Stratton街斯文顿区。主要£72.5项目改善公路在东部工作开始前斯文顿的新东部村庄住宅计划,将有8000房子的东A419。为Gablecross计划委员会的工作和工作预计将在今年夏天开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号