...
首页> 外文期刊>Highways >Viaduct is perfect showcase for Fowler & Holden
【24h】

Viaduct is perfect showcase for Fowler & Holden

机译:高架桥是完美的展示了福勒和霍尔顿

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Fowler ft Holder) Ltd have completed the supply of bespoke FastFlow bridge deck units for Cotthorpe Viaduct on the M1/M6 junction 19. Having manufactured and delivered over 720 unique non standard bridge deck units in a three-week window, Fowler & Holden believe no other business currently in the market could have matched their performance. The Catthorpe project threw up several challenges along the way that required innovative solutions. To meet the tight schedule required the company maximised the utilisation of both its foundry and engineering divisions and produced a kitemarked D400 Ductile Iron bridge deck unit in a variety of sizes.
机译:福勒英尺持有人)有限公司完成的供应定制FastFlow Cotthorpe桥面单位高架桥M1 / M6结19。生产和交付超过720独特的非标准的桥面单位三周窗口中,福勒和霍顿相信没有其他业务目前在市场上可以匹配他们的的性能。几个挑战,要求创新的解决方案。要求公司最大化的利用其铸造和工程部门和制作一个风筝标记D400球墨铸铁桥甲板单元的大小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号