...
首页> 外文期刊>Platt's Oilgram News >TC Energy cancels open season for Keystone Pipeline after KXl suspension
【24h】

TC Energy cancels open season for Keystone Pipeline after KXl suspension

机译:在KXL悬架后,TC Energy为Keystone管道取消开放季节

获取原文
获取原文并翻译 | 示例
           

摘要

Houston—TC Energy said Feb. 12 it will cancel an open season for 80,000 b/d of crude capacity on its existing Keystone Pipeline System now that the planned Keystone XL expansion is indefinitely suspending following the yanking of its federal permitting by President Joe Biden. TC Energy, which already plans to add 50,000 b/d of capacity to Keystone later this year, had planned for extra contracts and volumes on the current Keystone system starting in 2023 to coincide with the transfer of volumes to Keystone XL. However, Biden’s executive order on day one of his presidency renders those plans null and void.
机译:休斯顿TC能源公司2月12日表示,由于美国总统乔·拜登取消了Keystone XL的联邦许可,计划中的Keystone XL扩建工程将无限期暂停,该公司将取消现有Keystone管道系统每天8万桶原油产能的开放期。TC Energy已经计划在今年晚些时候向Keystone增加50000桶/日的产能,并计划从2023年开始在现有Keystone系统上签订额外的合同和产量,以配合向Keystone XL的产量转移。然而,拜登总统任期第一天的行政命令使这些计划无效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号