...
首页> 外文期刊>Platt's Oilgram News >China’s ZPC to trial second 200,000 b/d CDU of Phase 2 plant by end-March
【24h】

China’s ZPC to trial second 200,000 b/d CDU of Phase 2 plant by end-March

机译:3月底,中国ZPC审判第二阶段2阶段植物的二阶段B / D CDU

获取原文
获取原文并翻译 | 示例
           

摘要

Singapore—China private refiner Zhejiang Petroleum & Chemical is set to start trial runs at its second 200,000 b/d crude distillation unit at its 400,000 b/d Phase 2 refinery by the end of March, a source with close knowledge about the matter told S&P Global Platts. “The company targets to commence the Phase 2 project this year and run both the two phases at above 100% of their capacity, which will lift crude demand in 2021,” the source said. ZPC cracked 23 million mt of crude in 2020, according to the source. Platts data showed the utilization rate of its Phase 1 refinery hit as high as 130% in a few months last year.
机译:一位了解此事的消息人士告诉标普环球普氏,新加坡中国私人炼油厂浙江石油化工有限公司(Zhejiang Petroleum&Chemical)将于3月底在其40万桶/日二期炼油厂的第二套20万桶/日原油蒸馏装置开始试运行。“该公司的目标是在今年开始第2阶段项目,并在100%以上的两个阶段运行,这将在2021提升原油需求。”消息人士说。据消息人士称,ZPC在2020年破获2300万吨原油。普氏数据显示,其一期炼油厂的利用率在去年的几个月内高达130%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号