...
首页> 外文期刊>Journal of water, sanitation and hygiene for development >Life cycle cost analysis of water supply infrastructure affected by low rainfall in Ethiopia
【24h】

Life cycle cost analysis of water supply infrastructure affected by low rainfall in Ethiopia

机译:埃塞俄比亚降雨量影响的供水基础设施生命周期成本分析

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper challenges the assumption that low cost CAPEX (capital expenditure) water supply infrastructure provides reduced life cycle costs when compared with higher cost CAPEX investments. The assumption is applied through a comparison of 10 years of financial data (2006-2016) from point source water supplies (accompanied by Emergency Expenditure - EMMEX investments - emergency water trucking, treatment and distribution) and piped water supply systems in two districts of the Ethiopian Central Highland region of Amhara. This study concluded that on average point source water supplies accessing shallow groundwater were non-functional for an average of 60 months in a project period of 10 years. To supplement the water supply demand during the non-functionality period, emergency water trucking and treatment was provided over a 10 year period at a per capita cost of USD 2,257. In comparison, the per capita cost of piped water supplies was USD 65 for a project period of 20 years. The study concluded that piped water supplies are less expensive than point source supplies when CAPEX and emergency water supply provision costs are considered under a life cycle cost analysis.
机译:本文挑战了低成本资本支出(资本支出)供水基础设施与高成本资本支出投资相比能够降低生命周期成本的假设。该假设是通过比较埃塞俄比亚中部高原阿姆哈拉地区两个地区的点源供水(伴随应急支出——EMMEX投资——应急水运输、处理和分配)和管道供水系统10年(2006-2016)的财务数据应用的。该研究得出的结论是,在10年的项目期内,平均60个月的时间内,接入浅层地下水的点源水供应不起作用。为了补充非功能期的供水需求,在10年内提供了应急水车运输和处理,人均成本为2257美元。相比之下,在20年的项目期内,管道供水的人均成本为65美元。该研究得出结论,在生命周期成本分析中考虑资本支出和应急供水成本时,管道供水比点源供水更便宜。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号