...
首页> 外文期刊>Water and Energy International >Co-ordination of Fast Numerical Relays and Current Transformers -Overdimensioning Factors and Influencing Parameters
【24h】

Co-ordination of Fast Numerical Relays and Current Transformers -Overdimensioning Factors and Influencing Parameters

机译:快速数值继电器的协调和电流互感器 - 过度升压因子和影响参数

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper reports on some of the results of the working group WG 34.02, established by the Study Committee 34 to study and investigate co-ordination of relays and conventional current transformers (CT). The objective of the WG 34.02 work is to suggest common recommendations on how the manufacturers should specify the CT requirements and also suggest a guideline for co-ordination of relays and current transformers.The paper will show and discuss a more realistic and correct method of calculating the overdimensioningfactor of current transformers when co-ordinating fast numerical relays and current transformers, than what has normally been the common practice.
机译:本文报告了研究委员会34成立的工作组WG 34.02的一些结果,该工作组旨在研究和调查继电器和常规电流互感器(CT)的协调。工作组34.02的目标是就制造商应如何规定CT要求提出共同建议,并就继电器和电流互感器的协调提出指南。本文将展示和讨论一种更现实、更正确的方法,在协调快速数字继电器和电流互感器时,计算电流互感器的超尺寸系数,而不是通常的常规方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号