首页> 外文期刊>NGW's Gas Market Reconnaissance >Texas Eastern Transmission said it provided all the information federal safety regulators requested and is preparing to increasepressure in on Pennsylvania-to-Mississippi pipeline as soon regulators approve
【24h】

Texas Eastern Transmission said it provided all the information federal safety regulators requested and is preparing to increasepressure in on Pennsylvania-to-Mississippi pipeline as soon regulators approve

机译:德克萨斯东部传输表示,它提供了所有信息联邦安全监管机构,并准备在监管机构批准时准备在宾夕法尼亚州到密西西比州的管道上增加压力

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Enbridge pipeline declared a force majeure onMay 28 after the US Pipeline and Hazardous Material Safety Administration required the company to reinstate a 20% pressure restriction ontwo of three lines (Lines 10 and 15) that make up its 30-inch system between its Kosciusko, Mississippi, and Uniontown, Pennsylvania,compressor stations effective Jun. 1.
机译:None

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号