首页> 外文期刊>International Journal of Rock Mechanics and Mining Sciences >A geomechanical method for predicting the height of a water-flowing fractured zone in a layered overburden of longwall coal mining
【24h】

A geomechanical method for predicting the height of a water-flowing fractured zone in a layered overburden of longwall coal mining

机译:一种地质力学方法,用于预测水流碎片煤矿煤矿碾压水流裂缝区的高度

获取原文
获取原文并翻译 | 示例
       

摘要

Mine water inrushes result in serious casualties and property losses, and mining-induced water-flowing fractures are important channels for mine water inrushes. The prediction of the height of the water-flowing fractured zone (HWFFZ) is conducive to avoiding such disasters to a certain extent. In this study, the HWFFZ in layered overburden strata was systematically investigated by means of similar simulations, theoretical analyses and engineering verification. The following results were obtained. Fractures occur in overburden strata because the tensile stress exceeds the tensile strength, while fractures penetrate the overburden strata because the compressive stress exceeds the compressive strength. Whether a fracture penetrates the overburden strata can be expressed by the fracture penetration criterion (FPC) value and the compressive-tensile ratio (i.e., the ratio of the compressive stress to the tensile stress). If the FPC value is greater than the compressive-tensile ratio, the fracture penetrates the overburden strata. For both the 31401 mining face of the Bulianta Coal Mine and the 7130 coal mining panel of the Qidong Coal Mine, the FPC values of the water inrush regions are larger than those of the normal regions, and the compressive-tensile ratios of the water inrush regions are smaller than those of the normal regions.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号