首页> 外文期刊>Chemical Processing >Pad Your Cost Estimate!
【24h】

Pad Your Cost Estimate!

机译:填充您的成本估算!

获取原文
获取原文并翻译 | 示例

摘要

THE CONTRACTOR'S estimator worked up an estimate that was far too low. I knew it was low because, as is my custom, I used "Means Facilities Construction Cost Data" and past estimates to do a 90% budget estimate of the project. For one thing, she forgot to consider the demolition of a salt pit. I told her it was double-rebar but she missed it in her estimate. Regardless, I was forced to take the low bidder — but I knew the project would incur unavoidable cost overruns. I spent the morning of the first day of the project getting buy-ins from stakeholders for a change I planned to make. When the contractor's foreman approached to tell me the outfit was abandoning the job (because it figured the loss from completing the job would far outweigh forfeiting its deposit guarantee and the damage to its reputation), I asked him if he'd consider the change.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号