首页> 外文期刊>圧力技術 >Effects of The Clamping Force Scatter on The Bolting--Up Performance of Pipe Flange Connections
【24h】

Effects of The Clamping Force Scatter on The Bolting--Up Performance of Pipe Flange Connections

机译:夹紧力散布对管法兰连接锚固性能的影响

获取原文
获取原文并翻译 | 示例
       

摘要

It is well known that the scatter of bolt loads occurs when bolting up a pipe flange connection with a number of bolts. In general practice, two factors presumably have dominant effects on the non-uniform loads. One is due to the scatter of bolt clamping force when adopting a torque control method. The second is elastic interaction due to the flange deformation occurring in the process of successive bolt tightening. In this study, bolt-up finite element simulations of the pipe flange connection are conducted by considering the scatter of bolt clamping force when using the torque control method. Effects of interrelationship between the torque control method and the elastic interaction on the bolt load scatter occurring in the bolt-up process are evaluated.
机译:众所周知,当用多个螺栓螺栓连接管法兰连接时,会发生螺栓载荷的散射。 在一般的实践中,两个因素可能对非均匀载荷具有显着影响。 一个是由于采用扭矩控制方法时螺栓夹紧力的散射。 由于在连续螺栓收紧过程中发生的凸缘变形,第二是弹性相互作用。 在该研究中,通过考虑使用扭矩控制方法时的螺栓夹紧力的散射来进行管道法兰连接的螺栓上限有限元模拟。 评估了扭矩控制方法与螺栓加载过程中发生的螺栓载荷的弹性相互作用之间的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号