Design and erection of temporary steel roof for in-ground LNG storage tank

机译:地面液体液体储罐临时钢屋顶的设计与安装

获取原文
获取原文并翻译 | 示例
       

摘要

Structural design and construction of the temporary steel roof of the TL21LNG storage tank are described, and the selection of a material that is durable against low temperatures of -90°C is also discussed. Moreover, the buckling characteristicsof the steel roof with low rise and low rigidity were analyzed. The safety factor for the buckling load was set at 20 for analyses, and the safety factor of 20 was confirmed at each erection process. The roof construction using wire supports forinstalling heat insulation and membrane, pressure control during air support, and measurement of steel roof transformation at the time of construction is discussed together with the construction flow.
机译:描述了TL21LNG储罐的临时钢屋顶的结构设计和结构,还讨论了耐用于-90°C的低温的材料的选择。 此外,分析了具有低升高和低刚性的钢屋顶的屈曲特性。 屈曲载荷的安全系数在20分析时设定为20,并且在每个勃起过程中确认了20的安全系数。 屋顶结构使用电线载有储存隔热和膜,空气支撑期间的压力控制,以及施工时的钢屋顶变换的测量与结构流程一起讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号