...
首页> 外文期刊>石川島播磨技報 >Horizontal gust response of 'Tatara bridge' under construction
【24h】

Horizontal gust response of 'Tatara bridge' under construction

机译:建设中“塔塔拉桥”的水平阵风响应

获取原文
获取原文并翻译 | 示例
           

摘要

Wind tunnel tests of a long-span cable-stayed bridge under construction were conducted with two types of turbulent boundary layer simulations. The level of agreement between the wind tunnel measurements and a wind buffeting analysis varied withthe type of turbulent boundary layer. An investigation of this behavior found that the aerodynamic admittance used in the buffeting analysis was different from the measured aerodynamic admittance. Past research showed that buffeting analysis based onstrip theory, which assumes a spanwise correlation between the fluctuating wind velocity and the fluctuating aerodynamic loads. does not always hold.
机译:正在建设中的长跨度斜拉桥的风洞试验用两种类型的湍流边界层模拟进行。 风隧道测量与风力自动分析之间的一致性与湍流边界层的类型变化。 对这种行为的调查发现,在缓冲分析中使用的空气动力学导纳与测量的空气动力学导纳不同。 过去的研究表明,基于基于乘法理论的自助分析,其假设波动风速和波动空气动力载荷之间的始线相关性。 并不总是坚持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号