...
首页> 外文期刊>World Steel Capacity News >EL HADJAR SETTLES IRON ORE ISSUE THIS TIME AND RESTARTS BF
【24h】

EL HADJAR SETTLES IRON ORE ISSUE THIS TIME AND RESTARTS BF

机译:el hadjar这次沉淀铁矿石问题并重新启动bf

获取原文
获取原文并翻译 | 示例
           

摘要

After the six-day break in BF unit operations due to the lack of iron ore stocks, Algeria’s El Hadjar man- aged to solve the matter and resume production. The company took additional measures to strengthen the raw material supply, hedging the risk of possible interruptions later on. The company restarted its BF on September 8, 2019 after increasing the level of its iron ore stocks. The operations were halted on September 2, Metal Expert reported. “The iron ore stocks of the complex have been increased to a level ensuring the activity of one week pending the resolution of the problem of supplies of raw material,” Algeria Press Service informs, citing the plant’s officials. El Hadjar’s daily iron ore requirement is 8,000 t.
机译:由于缺铁矿石股票六天休息后,阿尔及利亚的El Hadjar人员来解决问题并恢复生产。 本公司采取了额外的措施来加强原料供应,落后可能中断的风险。 该公司于2019年9月8日在增加其铁矿石股市后重新启动其BF。 据报道,金属专家,该业务停止于9月2日。 “复杂的铁矿石股已经增加到了一个水平,确保了一周的活动等待解决原材料供应问题”,“阿尔及利亚新闻服务通知,引用工厂的官员。 El Hadjar的日常铁矿石要求是8,000吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号